TRU Retrofit & Energy Centre

Sector

Public Buildings and Institutions

RWC Office

RWC Kelowna

Project Status

Under Construction

Size

24,500 sq. ft.

General Contractor

PCL

Description

RWC Systems has been awarded the interiors scope for the Thompson Rivers University (TRU) Low-Carbon District Energy System (LCDES) Energy Centre and retrofit of eight campus buildings. The contract includes approximately 24,500 sq ft of drywall (interior & exterior gypsum sheathing), 13,000 sq ft of steel-stud framing, 6,000 sq ft of insulation, plus 9,600 sq ft of acoustic ceiling tile re-installation and other specialty finishes across the retrofit phase.