Sector
Public Buildings and Institutions
RWC Office
RWC Kelowna
Project Status
Under Construction
Size
24,500 sq. ft.
General Contractor
PCL
Description
RWC Systems has been awarded the interiors scope for the Thompson Rivers University (TRU) Low-Carbon District Energy System (LCDES) Energy Centre and retrofit of eight campus buildings. The contract includes approximately 24,500 sq ft of drywall (interior & exterior gypsum sheathing), 13,000 sq ft of steel-stud framing, 6,000 sq ft of insulation, plus 9,600 sq ft of acoustic ceiling tile re-installation and other specialty finishes across the retrofit phase.