Sector
Infrastructure
Value
Confidential
Description
Uculuet Secondary School project was a seismic upgrade and an addition to the existing school and was completed in 18 months.
RWC Systems was responsible for the exterior and interior steel stud, the acoustic ceilings, acoustic wall panels and extensive wood ceilings