Sector
Infrastructure
Location
Burnaby, BC
Value
Confidential
General Contractor
Graham Construction
Description
An extensive 2- year renovation to an existing SkyTrain station. It included exterior structural framing and specialty metal pan ceilings. Prefabricated trust loops were built on the ground and craned in place during 1:30am-4:30am.
The largest logistical challenge was public safety as the station remained operational during this time.